Solar Farm
Monday, March 30, 2009
Connections of New Ground
These connections (plans and sections) are produced from taking sections of the new ground/ field (from previous posted model) abstracting them and connecting to the existing ground.
Saturday, March 28, 2009
Creating a Field
Site Perspectives
Friday, March 27, 2009
Spacing of Turbines
After going to the site and looking at the distance between turbines, the previous dimensions I had were far off.
Overlay Drawing
Wednesday, March 18, 2009
Train going Thru Site
Tuesday, March 17, 2009
Points. Lines. Planes
Saturday, March 7, 2009
Revised Site Sections with 10 fwy
Thursday, March 5, 2009
WindTurbine Directions
Monday, March 2, 2009
Topography of the Wind
air flow around a wind turbine
Sections/ Site Area Plan with water and fault lines
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2009
(69)
►
May
(12)
►
April
(4)
▼
March
(13)
Solar Farm
Connections of New Ground
Creating a Field
Site Perspectives
Spacing of Turbines
Overlay Drawing
Train going Thru Site
No title
Points. Lines. Planes
Revised Site Sections with 10 fwy
WindTurbine Directions
Topography of the Wind
Sections/ Site Area Plan with water and fault lines
►
February
(14)
►
January
(26)