Monday, April 20, 2009

Wednesday, April 15, 2009

Friday, April 3, 2009

Rhino Surface





This model uses existing lines on the site. The elevation is in reference to these lines on the site: example road is high, built above the land and ponds are low, carved from the land.

I am concentrating on the triangular piece of land discovered through the "overlay" of the systems on the site. I am taking this new topography, taking sections and adjusting them specifically to meet the forces at that moment on the site. These sections will transform the topography to a very specific performative one. The space below will start to connect other areas of the site.

Tuesday, March 31, 2009

Monday, March 30, 2009

Connections of New Ground




These connections (plans and sections) are produced from taking sections of the new ground/ field (from previous posted model) abstracting them and connecting to the existing ground.

Friday, March 27, 2009

Spacing of Turbines





After going to the site and looking at the distance between turbines, the previous dimensions I had were far off.

Overlay Drawing

Thursday, February 26, 2009